Many hyperlinks are disabled.
Use anonymous login
to enable hyperlinks.
4 check-ins related to "month-truncate"
2024-03-02
| ||
21:02 | New date/time modifiers "mnth" and "yr" work like "month" and "year" but resolve day-of-month overflow by truncating rather than rolling over into the next month. Forum thread 232d1abb5d (check-in: 5d392c16 user: drh tags: trunk) | |
20:50 | Change the magic time-interval names that do truncate-to-same-month to be "mnth" and "yr" - "month" and "year" without the vowels. (Closed-Leaf check-in: 296b46c5 user: drh tags: month-truncate) | |
13:38 | Proof-of-concept for new time-interval operator "pg-month" and "pg-year" that use the truncate-to-month algorithm for month overflow instead of the wrap-to-next-month algorithm that is used by SQLite by default. (check-in: b606c096 user: drh tags: month-truncate) | |
2024-02-29
| ||
10:55 | Fix two -Werror=lto-type-mismatch warnings reported in forum post ef62b57bd5. (check-in: 803481f2 user: stephan tags: trunk) | |